AeroWorks Extra 260 User Manual Page 7

  • Download
  • Add to my manuals
  • Print
  • Page
    / 13
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 6
7
Manual Choke Installation
1. Locate the choke bell crank that was assembled
in the previous steps. Install bell crank assembly
onto fuselage floor as shown with one arm fac-
ing forward and the other arm to the top.
2. To help with alignment of block attach the push-
rod to the vertical portion of the bell crank as
shown below.
3. Mark and drill hole for long choke pushrod loca-
tion.
4. Unhook the clevis from the bell crank and install
the long pushrod to the bottom portion of the
bell crank using the pre-bent “Z” bend. Drop
pushrod through hole.
Mark Pushrod Location
Page view 6
1 2 3 4 5 6 7 8 9 10 11 12 13

Comments to this Manuals

No comments